Kearsarge Tiverton

Kearsarge Tiverton (Tiverton, RI)

Commissioned in late 2020, the site was designed with habitat for local wildlife and pollinators in mind.  The site hosts sheep for vegetation management, with bird habitat and pollinator friendly flora under and around panels. 

Click here to see a fantastic aerial video of the site!

Sized at almost 3 MW DC, the site was developed, financed, and constructed by Kearsarge;  offtakers include a local university and regional school district.

  • Size: 2.9 MW DC

  • Production: Approx. 3,963,000 kWh / year

  • Tons of Annual Carbon Dioxide Offset: Approx. 3,096

  • Number of Average homes’ electricity use: 510