Located in central Maine, Kearsarge co-developed the nearly 30 MW site with Walden Renewables. The site is located on approximately 110 acres of land and will contribute to the advancement of large scale utility projects in the area while delivering clean power. State of the art tracker technology enables Leeds’ solar panels to capture more sunlight throughout the day, improves resistance to wind damage, and allows panels to more fluidly shed snow and ice in the harsh Maine environment. Construction began in the summer of 2024 and the site started generating power in December of the same year.

  • Size: 27.6 MW DC

  • Approximate Annual Production: 45,806,975 kWh

  • Annual Carbon Dioxide Offset: 33,924 tons

  • Number of Average Homes Powered Annually: 6,413