STJ 3.0
Kearsarge St. Johnsville (St. Johnsville, NY)
About the Project:
The 1.5 MW solar site in Franklin, Massachusetts, completed in 2023, features an on-site battery storage system. It is the third project developed on land owned by Mount Saint Mary’s Abbey, marking a long-standing partnership between the Abbey and Kearsarge. Located in National Grid territory, the solar facility generates 100% of its power for low-income off-takers, helping to support community energy access. Kearsarge worked with National Grid through a complex interconnection process to strategically avoid congested grid areas and minimize impacts on local energy infrastructure.
Size: 1.5 MW DC
Approximate Annual Production: 1,966,258 kWh
Annual Carbon Dioxide Offset: 1,456 tons
Number of Average Homes’ Electricity Use Annually: 275
Follow the link below to see live and historical production data at Kearsarge St Johnsville:
https://hmi.alsoenergy.com/powerhmi/publicdisplay/67e7370c-76d2-4a71-99fa-f32196764381/main?arg=NzAwMDY%3d&lang=en-US